After several rounds of environmental impact assessments and preliminary geological surveys, the much-anticipated Rail Transit Line R3 is finally about to enter substantial construction. The project will strengthen the foundation for on-site standardization during construction, supported by the “four modernizations” (specialization, factory production, mechanization, and informatization), maintain normalization, and deeply advance on-site standardization. There is confidence and determination to build the Jinan Metro into a “safe metro, green metro, smart metro, and quality metro”. Along this subway line, multiple sets of the BS1200A batching plant control system independently developed by Shandong Boshuo have been adopted, as shown below: a set of mud batching plant control system located near Aoti Middle Road, Jinan High-tech Zone.


